What are the precautions for the installation of EV Charger station?

With the boom of electric vehicles, a large number of Installation of EV Charger station have also begun to follow, and the following are the precautions for the EV Charger installation process.

1. Site selection problem

Choose a ventilated, dry, and easy-to-maintain place for Installation of EV Charger station, while taking into account the convenience of power access and vehicle charging, as well as the safety distance between the EV Charger station and the vehicle. Avoid installing EV Charger station in places exposed to direct sunlight and rainwater.

2. Power connection safety

The power connection of Installation of EV Charger station needs to be evaluated and designed by professional electrical personnel to ensure that the power connection line can withstand the load of the EV Charger and meets national safety standards. During the installation process, it is also necessary to pay attention to issues such as the grounding protection of the power supply.

installation of ev charger station
installation of ev charger station
3. Choose the right type of EV Charger station

Choose the right type of EV Charger station according to different types of electric vehicles and charging needs. At the same time, the number and layout of charging piles need to be determined according to factors such as the number of vehicles and charging frequency.

4. Pay attention to installation details

In the process of Installation of EV Charger station, it is necessary to pay attention to details, such as the fixing of Chargers should be firm and reliable, the charging interface should meet national standards, and the laying of cables should meet specifications. In addition, it is also necessary to consider the maintenance and maintenance of charging piles to ensure the long-term stable operation of the equipment.

5. Fire safety

Based on fire safety considerations, large-capacity fast charging products should be preferably installed on the ground.

6. Acceptance requirements

according to the design requirements, the equipment and facilities are fully installed, intact, pollution-free, rust-free, and have the conditions for use; The distribution box (cabinet) is installed squarely and shall not affect the use function of parked vehicles; The connection between the bridge and the distribution box and the cabinet is required to cross the ground wire, and protective measures should be taken before the cable is threaded at the knife edge of the distribution box and cabinet, and the hole should be fireproofed.

The above are some of the things that need to be paid attention to in the Installation of EV Charger station, I hope it will be helpful to you, if you have any questions about the Smart EV Charger, you can contact AEGEN.